Member of BLRT Grupp

 

Frontpage Slideshow | Copyright © 2006-2013 JoomlaWorks Ltd.

BOP Elevator

Client: National Oilwell Varco

Total Weight: 192 Tons

Time for the Manufacturing: 8 Months

The project is of a high interest because of its heavy weight. The project is manufactured and tested in accordance with the strict requirements of the offshore drilling industry.

The scope of work included:

  • Telescopic cylinder for BOP Elevator;
  • Outer frame assembly;
  • Inner frame assembly;
  • Hang-off adapter assembly.

All equipment is designed by NOV.