Member of BLRT Grupp

 

Frontpage Slideshow | Copyright © 2006-2013 JoomlaWorks Ltd.

LMRP Gantry Crane

Client: National Oilwell Varco

Total Weight: 37 Tons

Time for the Manufacturing: 6 Months

This is another member of gantry crane family manufactured by Marketex Offshore Constructions for National Oilwell Varco (NOV). LMRP (Low Marine Riser Package) Gantry Crane is a part of complex BOP handling system. The prime function of BOP/LMRP handling system is to safely transport/lift the equipment from the parking/storage position to the well center or vice versa. The work scope included steelwork, painting and hydraulic assembly.

All equipment is designed by NOV.